SE MA NEMBA Flyway Trail Build

Date

4/10/21 9:00am

SE MA NEMBA Flyway Pond Trail Boardwalk Build

This Saturday April 10th, we will be moving materials and constructing some boardwalk bridges on the Chickadee Lane Connector to the FlyawayPond Trails, and I'm looking for volunteers. 

 

The materials for this project are being graciously funded by donations from Town of Easton Residents through our newly established Conservation Trailwork Gift Fund, and by NEMBA.

 

The plan for this Saturday will be to move materials in and start constructing boardwalks for the entry trail.

 

Start time:  9AM Saturday  - we will work until 12:30. (there will be more dates forthcoming)

 

Meet Location: Meet at trail-head located at the corner of Chickadee Lane and Kerry Lane in Easton, MA. On street parking is the only way to go, please be courteous to the neighborhood when parking.

 

 

What to Bring:  A face mask, Wear long work pants & work boots, bring work gloves, and bring eye protection. Please bring your own food and water to drink. 

 

The primary work starts by moving the boardwalk materials into the woods.

Anyone that wants to work on the decking crew, and have a battery screw gun please bring it.

If you want to work on the build crew, bring a framing hammer. All other tools will be provided. 

 

Due to the Covid-19 pandemic, NEMBA guidelines require that volunteer group sizes be limited to 10 people max. We will be breaking into 3 separate crews of 10 each. The Covid-19 guidelines set forth by NEMBA can be found here: https://www.nemba.org/news/nemba-covid-guidance-individual-and-group-ridesIn addition I ask that if you feel ill the day of or have any cold-like symptoms, or have been in the presence of someone with an active covid-19 infection in the last 14 days, please dont attend.

 

Any questions, please feel free to reply to this email, or call me.

 

Please Sign NEMBA's Annual Waiver ahead of time if you haven't already done so.

Chapter

SE Mass

Event Leader

Chris Patrick
mtbchris@gmail.com