SE MA NEMBA Flyway Pond Trail Boardwalk Build

Date

5/2/21 8:30am

SE MA NEMBA Flyway Pond Trail Boardwalk Build

This Sunday May 2nd, we will be continuing trailwork on boardwalks, on the Chickadee Lane Connector to the FlyawayPond Trails, and I'm looking for volunteers. 

The materials for this project are being graciously funded by donations from Town of Easton Residents through our newly established Conservation Trailwork Gift Fund, and by NEMBA.

The plan for this Sunday will be to continue with moving materials in and constructing boardwalks for the entry trail.

Start time:  8:30 AM Sunday  - we will work until 12:00. (there will be more dates forthcoming)

Meet Location: Meet at trail-head located at the corner of Chickadee Lane and Kerry Lane in Easton, MA.

On street parking is the only way to go, please be courteous to the neighborhood when parking.

What to Bring:  A face mask, Wear long work pants & work boots, bring work gloves, and bring eye protection. Please bring your own food and water to drink. 

Anyone that wants to work on the decking crew, and have a battery screw gun please bring it.

If you want to work on the build crew, bring a framing hammer. All other tools will be provided. 

Due to the Covid-19 pandemic, NEMBA guidelines require that volunteer group sizes be limited to 10 people max. We will be breaking into 3 separate crews of 10 each. The Covid-19 guidelines set forth by NEMBA can be found here: https://www.nemba.org/news/nemba-covid-guidance-individual-and-group-ridesIn addition I ask that if you feel ill the day of or have any cold-like symptoms, or have been in the presence of someone with an active covid-19 infection in the last 14 days, please dont attend.

Any questions, please feel free to reply to this email, or call me.

   Please Sign NEMBA's Annual Trail Care Waiver ahead of time if you haven't already done so.

Chris

774 284 2650 mobile

 

Chapter

SE Mass

Event Leader

Chris Patrick
mtbchris@gmail.com